Industries / Ports & ShippingSector 10 of 15

Power Quality for Ports & Shipping

The cranes, refrigerated containers and drives that keep a terminal moving waste electricity before it does any work, and HarmoniQ stops that waste at its source without closing a berth.

01 / The problemLow voltage · AC

Ports Are Electrically Demanding Places

A terminal runs cranes that start and stop under load, refrigerated containers that stay plugged in around the clock, and the pumps, lighting and workshops that keep the quay working. Together they distort the current flowing through your network and draw current that does no work, so part of every kilowatt-hour you pay for never does useful work. It becomes heat, in your cables, your transformers and your motor windings.

It doesn't appear on your bill as a line of its own. It shows up as higher consumption, power-factor penalties, capacity charges, and drives, motors and transformers that age before they should.

10–20%

Typical saving in kilowatt-hours on a terminal's low-voltage loads, by preventing the losses before they occur

02 / Where it comes fromThree problems, three units

Where the Waste Starts on a Terminal

Three problems account for most of it, and each has a unit that sits where the problem starts.

Harmonic distortion

Crane and pump drives

Low-voltage drives on yard cranes, pumps and fans draw current in sharp pulses. The 5th and 7th harmonics ripple through the terminal, heating cables and transformers and upsetting PLCs and control systems.

FittedHarmoniQ Delta, at the drives

Reactive power

Reefer compressors and motors

Reefer compressors, crane motors and pumps draw current that does no work but still has to be supplied, inflating the apparent power you are billed for and the capacity you have to reserve. Banks of reefers cycle on and off across shared circuits, so that demand keeps shifting.

FittedHarmoniQ Alpha at the load, HarmoniQ Sigma at the incomer

Phase imbalance

Lighting and workshops

Lighting masts, workshops, offices and other single-phase services load the three phases unevenly, and the balance shifts as they switch on and off. The difference flows down the neutral and sets up counter-rotating fields in your motors: heat without torque.

FittedHarmoniQ Alpha, at the load

See each unit at work in the network explorer
03 / What changesProven at your own meter

Same Machines. Less Power.

With the waste prevented, the same terminal handles the same cargo on fewer kilowatt-hours. With power-factor penalties gone and capacity charges lower too, that can take up to 25% off your total electricity bill where all three apply.

Energy savings · kWh
10–20%
Power factor
0.98+
Equipment life · Arrhenius
2–4×
Operational disruption
0
04 / What we hearAnd the reality

What We Hear, and the Reality

  • We hear

    “Crane work is too volatile. You can't smooth that out.”

    The reality

    You can't change what a crane cycle asks of the supply, and HarmoniQ doesn't try to. It cuts the reactive and distorted current that cycle creates, so less of what you draw ends up as heat in your cables and transformers. It does not slow a crane down.

  • We hear

    “Shore power is the real power-quality concern, and that is a problem for later.”

    The reality

    Shore-power connections for large vessels are medium voltage, which is outside what HarmoniQ addresses, so we make no claim there. Behind the transformers, the low-voltage network feeds your reefer banks, crane drives, pumps and lighting, and it wastes energy today. That is where we work.

  • We hear

    “We can't take a berth or a crane out of service to fit equipment.”

    The reality

    You don't have to. HarmoniQ connects in parallel, alongside your circuits rather than in series with them, so nothing on the terminal runs through it. It goes in with berths and cranes working, and the on/off test proves the saving at your own meter. The units are indoor equipment and go in your electrical rooms.

05 / How it worksThree steps, zero disruption

Three Steps. Zero Disruption.

  1. 01 · Assess

    Measure the network

    Our engineers measure your network, from the yard cranes to the reefer banks, and show you where energy is being wasted, before anything is fitted.

  2. 02 · Install

    Fit alongside your circuits

    Each unit goes in where its problem starts, connected in parallel, with the terminal running.

  3. 03 · Prove

    Test it on and off

    The on/off test proves the saving at your own meter, before any annual figure is quoted.

How the on/off test works
Next stepenquiries@harmoniqtechnologies.com

See What HarmoniQ Can Do for Your Terminal

Our engineers will measure your site and show you exactly where energy is being wasted, and how much of it HarmoniQ can prevent.